Project details
The total construction area of Vanke Golden Mile Blue Bay is about 391,531.94 m2, the plot ratio is 3.0, and the green rate is 35.11 c/o. It is one of Vanke's mature product lines. It is the 19th Golden Mile Blue Bay built by Vanke's 32 years of experience. Vanke's upgraded lake in Nanning is a masterpiece. The project is located on the bank of Wuxiang Lake in Wuxianghu International Residential Area. It is close to the commercial cluster of Wuxiang Headquarters Base and is about 500 meters away from Line 3 of Metro Line 2. In addition, the project enjoys exclusive dual subway facilities and has transportation. The “three vertical and three horizontal” traffic road network has more than eight bridges flying freely connecting Jiangnan Jiangbei, which improves the convenience of travel. The project has 1400 hectares of Wuxiangling Forest Park and 122 hectares of Wuxianghu Park. The project is on the front line of the lake, the first line to see the mountain, and the exit is the park, which is the most important urban ecological landscape.
Project address: No. 7 Fenghuang Road, Liangqing District, Nanning (South of Wuxianghu Park)
Project telephone: 0771-5575999