At the construction site, President Zhang listened in detail to the project leader and the work report of the group's on-site engineers. After understanding the current construction progress and the current situation of the project, he fully affirmed the work of the project team. He pointed out that the construction goal of Shangfeng Hall is to build a “Humanities Art Hall” with a good reputation in Beijing. The implementation of this project is of great strategic significance for promoting the nationwide development of Zhongtian Group's diversified business. I hope the project team colleagues will maintain Good working conditions, carry forward achievements, and speed up the progress of the project on the basis of ensuring the quality of the project. Subsequently, President Zhang and the project leader also conducted in-depth discussions on the post-project work plan.
The president of the group visited the construction site to inspect and guide the work, which greatly encouraged the staff of the project team. They were enthusiastic and confident in their work. It is understood that in order to ensure that the construction period can be completed on time, the engineers and project team staff stationed by the group have overcome various difficulties in winter construction in the north and always insist on fighting in the construction line. At present, the main structural project of the hall has been basically completed, and follow-up projects are also intensifying, and it is expected to be put into use as scheduled.
President Zhang inspected the construction site